• Menu

  • Schedule

  • Search

  • Login
Please feel free to email the webmaster if you’re an old student and have forgotten the login information.

  • Home
  • What is Vipassana
    • What is Vipassana
    • The Art of Living: Vipassana Meditation
    • Mr. S. N. Goenka
    • Introductory Videos
    • Vipassana International
    • About the Center
  • Courses
    • What to Expect
    • Modana Schedule
    • Children’s Courses
    • How to Apply
    • Code of Discipline
    • Questions & Answers
  • Diversity
  • Contact
  • Getting Here
  • Photos
  • Old Students

Photos

Vancouver Island Vipassana Association 

2018 – Present, Calais Road, Duncan 

20190518_135714 Inner Court Yard Water Fountain Archway 20190518_135732 20190518_140820 20190518_140944 20190518_141016 20190601_114807 20190608_114700 20190608_114757 20190608_114808 20190718_193544 20190718_193554 20190718_193638 20190729_174421
[Show picture list]

2006 -2018 Lake Cowichan 

10bob-and-jenny-making-trail-in-trees 1athe-newly-cleared-land 1getting-started 2doug-finished-gate 3bear-fence-gate 4don-and-carsten 5don-and-carsten-digging-hole-for-gate-post 6don-and-carsten-digging-hole-for-gate-post 7robert-prepping-tent-sites 8jennifer-making-dining-room-seats 9steve-putting-up-curtain-rods 1apumphouse 1pumphouse 2pumphouse 3pumphouse 4pumphouse 5pumphouse 6pumphouse 1first-day-sit-in-new-hall 2first-day-sit 3first-day-sit-lots-to-see 4another-day-sitting 5mens-dunny 6group-sit 7lunchtime 8trust-meeting img_0639 img_0810 dsc_8059-a-group-sit-cropped dsc_8065-group-meditation dsc_8072-a-meal-with-friends dsc_8075-applying-the-food-cropped dsc_8080-decisions dsc_8086-discussing-cropped dsc02277 dsc02280 dsc02285 dsc02288 dsc02295 dsc02298 img_0707 img_0708 img_0709 img_0714 img_0715 01-john-carston-and-don-laughing-at-the-demands-for-them-to-stop-laughing-sunday 02-we-have-power-sunday 03-daniels-chameleon-cap-blends-in-sunday 04-serious-don-is-serious-sunday 05-the-artist-sunday 06-doug-cornered-sunday 07-guy-fixing-the-outhouse-no-really-sunday 08-sunday-ends 09-harry-explains-his-hat-to-james-and-ben-post-afternoon-group-meditation-monday 10-daniel-james-and-the-dhamma-hall-monday 01 House mid span 02 Bridge set up and trailer wheels 03 Weather 04 Almost over Oliver Creek 05 Yoke towing assembly 06 Setting up blocks to come down off the bridge platform 07 Bridge assembly 08 Extra engine for the hill 09 Back to a single vehicle 10 Around the corner heading into the landing 11 Good clearance 12 Site prior to house arriving 13 Location for house before arrival 14 Barn lifted and ready for work, excavator to the west 15 Looking down on the barn from the upper septic fields 16 Rear of the house will face the barn 17 Arriving at house site 18 Backing up - a 19 Backing up - b 20 Parked and damage to the rain gutter 21 House with barn in the background 22 The house will sit a little less than one story higher 23 Area cleared for power poll 24 View back towards the house from the existing power poll 01 The Fleet arrives 02 Setting the corners in place 03 Building the footings 04 Rebar estimates 05 John models the majestic resprocating saw while Gordie and Jim level the footings. 06 Breaking for lunch and you may notice that the ground was out of level by almost 10 inches in the left hand side of this photo 07 Skirting and back filling 08 Laying and tying the rebar 09 Barn footings close to completion 10 After this photo was taken it was decided to drop the rebar a little lower in the footings, and more back fill was added 11 The house as we left it on the evening of day 3 01 Footing showing ground floor recess 02 Footing recess construction 03 Cutting out section of footing wall where they're joined mid span 04 Photo from the north east corner looking at the rear of the house 05 Support footing under a beam running the length of the house 06 Photo from the south east corner of the building looking at the front of the house 11 Out house for the lower property being built 12 Freshly painted 13 Wood chips ready and waiting 14 Pump covering painted 15 Showers newly sided with decks and shower painted 16 New curtains on the north side of the Dhamma Hall 17 New Curtains on the south side of the Dhamma Hall 18 Task list needs updating 19 Twisted metal in the foreground 20 Fuso 4 x 4 work shop and Tim 21 Stanchion 22 Polishing after the welding is completed 23 Final product 24 Female entrance 25 Male entrance 01 Dhamma Hall around 9am 02 Figuring out the Weed Wacker 03 Surespan arrives with the concrete 04 Jim's set to run one of three wheel barrows. 05 Set up under the Barn 06 Prepped for the first load 07 Footings setting up 08 More wet finished concrete 09 Dining room and inhabitants 10 An example of what the Kitchen staff throws together. 11 Another fine food photo 12 Two of the three kitchen severs are pleased 13 Prelude to a very noisy afternoon group meditation. 14 Cleats removed from the top of the drying footings 15 Dan laying out the stantions 16 Building up the outside wall 17 Andreas blocking off the wall for the main entrance 18 Don't do this at home 19 Part of Wednesday's crew 20 Gord and Dan bracing and trueing the forms 21 Hey, work in the work shop 22 John and spacers 23 Doug setting snap ties 24 Carsten pinning the inside wall 25 Atlas shrugged 26 Afternoon clouds gathering down the valley 27 Wednesday ends 28 Packing up for the day 29 The Mill site with burms created from leftover wood 30 Random scenery photo shot behind the pump house. Shows the hand sink washing area and one of the showers 31 Part ofThursday's crew 32 Vehicles set up 33 Pano of trucks and both buildings 34 Volunteers are ready 35 Moments before Gordie is knocked down with the first cough from the pumper truck 36 Scraping off the excess after it's been poured and then settled with the vibrator 37 Alec the pump truck operator discussing how to proceed with Gordie and Bo. Note the pump hose close off with a basic pinch fold 37 Scraped and ready to be finished 38 Doug carrying the vibrator over to the house from the barn 39 Pedro and Jim working on the top of the wall 40 Gordie finishing 41 John finishing 42 Carl finishing 43 Both jobs completed 44 Carl stripping the forms 45 Corner photo of the form build 46 one of the areas we neglected to place a lock bar, thus allowing pressure from the concrete to bow out the form 47 Front of the house with footing 48 About four feet of headroom under the house as it stands before being lifted. 49 Angle from the back of the house. The pumper truck allowed us to access the center footings with the extension hose 50 John and Carsten after the cleanup on Friday 51 Concrete wall with a space available for future side door and outside mudroom 01 Outhouse delivery 02 Neighbour with his backhoe laying pit run on the power pole access road, and then digging a hole for the outhouse 03 Outhouse location, location, location 04 Liam with jack hammer removing the last of the fireplace 05 Amanda working on the horizontal rebar for the house walls 06 Rebar Rob 07 Prior to the Barn being lowered, pockets were cut into the walls to accommodate the supporting I beams 08 Pocket in the rear wall 09 Barn lowered showing I beam in the wall pockets 10 barn on it's home 11 House footings with plate located by plumb and then nailed in place 12 Levitating house 13 House on blocks 14 House raised about one foot above its final resting height 15 View from the main center road 16 More space now to work 17 Erecting wall forms 18 Wall forms 19 John Carsten and Cameron finished for the day 20 Cameron working on the east wall 21 John setting up his compressor while Bo and Carsten set up the rear ground floor entrance 22 View of the job site 23 Apres house pour 24 Great work on the forms 25 Ground floor rear access 26 Interior curbs for brace walls 27 A last minute change in plans for posts supporting the beam running the length of the house 28 Drain pipe and drain rock ready to be placed 29 Charles and Christa begin stripping the forms 30 Lunch break from work and the Trust Meeting 01-Pumper truck delivering concrete for the house forms 02 Waterproofing the footings and walls 03-Keiran prepping the ground next to the footings for the drain tile 04-Wade and Bo selecting wood for framing the ground floor of the house 05-Carsten-framing-a-pocket-for-the-I-beam-to-allow-it-to-be-removed-once-the-house-is-lowered. 06-Apre-late-noon-meal-mid-August 07-The-outside-walls-framed-and-ready-to-support-the-house 08 Enclosing the porch end of the house allowed us to have full rooms below. The wood floor was replaced due to rot. Greetings from Wade. 09 North west corner of the porch 10 Carsten setting drain pipe 11-Lowering-the-house-into-position 12 Pano shot of the house lowered in place with the workshop just visible in the back ground. Still hot and sunny in this shot 2 - Building footings and walls for house 3 - House ready to be lowered 4 - House with Workshop in the distance 5 - Aerial view of project 6 - Volunteers with workshop 7 - Lunch break House Delivery 20180626_141546 IMG_4751 DSC_1539 DSC_1536 accom01 accom07 accom06 accom05 accom04 accom03 accom02 20171230_143610 20171230_143633 20171230_143717 1_20190526_113029 20190518_135714 Inner Court Yard Water Fountain Archway Back Garden 20190518_135714 20190518_135732 20190518_140820 20190518_140829 20190518_140944 20190518_140953 20190518_141016 20190518_141032_001 20190518_141215 20190601_114601 20190601_114807 20190601_114815 20190608_114700 20190608_114757 20190608_114808 20190718_193544 20190718_193554 20190718_193612 20190718_193638 20190729_174421 1foundations1 01dh-modana-from-kite2 2foundations2 02dh-modana-from-kite 3foundations3 03road-to-centre1 4floor 04dh-modana-ferns-trees-portrait 5floor 5dh-modana-ferns-trees3 6floor 6on-the-land-planning 7floor 7aoliver-creek 7a-road-to-centre 7oliver-creek2 8lunch KONICA MINOLTA DIGITAL CAMERA 9lunch 9sitting-on-the-land 10lunch 10dhamma-hall-painted 11group-sitting-in-hall2 11deer 12workers 12-2011-clearing-the-land 13walls 14kddh-plot 14walls 15next-steps 15walls 16walls 17walls 18walls 19walls 20painting 21painting 22painting 23finished KONICA MINOLTA DIGITAL CAMERA
[Show picture list]

Land Acknowledgement

The Dhamma Modana Trust acknowledges that we are located on the traditional, ancestral and unceded lands of the Hul'q'umi'num'speaking peoples including Cowichan Tribes, Ts'uubaa-asatx (Lake Cowichan), Stz'uminus (Chemainus), Halalt, Lyackson and Penelakut First Nations. We honour and respect the peoples and all their ancestors on whose lands we are grateful to gather today.

Dhamma Modana is committed to creating a more welcoming environment for Indigenous students and to strengthening our relationships with neighbouring Indigenous communities.

View Schedule and Apply

Connect With Us

Contact Us

Phone: +1 250-749-4499
Email: [email protected]

Directions

2359 Calais Rd
Duncan, BC, Canada V9L 5V5
App store us uk    Play store badge
Dhamma.org Mobile App